Companies can minimise capex costs by setting up logistics operations at KIZAD Logistics Park (KLP). Set to become one of the leading warehousing centres in the region, KLP is comprised of pre-built, well-designed modular warehouse units equipped with easy access loading docks for trucks, raised docked floor levels and clear open spaces for the eaves. Each unit has its own dedicated loading yard with ramp access for forklifts and designated on-site parking.
All units are provided with sufficient power to be cooled to a target temperature of 25°C. Around 15% of the units are equipped with enhanced power provision for cold storage.
KLP is designed to be fully flexible with combinations in various sizes and layouts. The design also includes the shell and core scheme for setting up a mezzanine office.
There are two domestic industrial zone phases and one free zone phase to choose from. KLP Phase 1 comprises 41 units (already let) while KLP Phase 2 has 64 warehouse units ready for lease.
The free zone phase of KLP is currently under design and can take up approximately 17,000 square metres.